• <dd id="cc7bz"></dd>

    <th id="cc7bz"></th>

      <dd id="cc7bz"></dd>

    1. <button id="cc7bz"><acronym id="cc7bz"><input id="cc7bz"></input></acronym></button>
      <th id="cc7bz"></th>

          <rp id="cc7bz"></rp>
        1. <tbody id="cc7bz"></tbody>

            <dd id="cc7bz"><pre id="cc7bz"></pre></dd>

            The Foundation 3

            Jiangsu Datang Binhai Offshore Wind Farm Project contains 50 MySE3.0-135 wind turbines in construction. This wind farm mainly contains the mealy sand and silty clay, the monopile foundation is finally chosen for the purpose achieve cost optimization that depend on the seabed elevation of -17.5m~ -22m. There are almost 25 wind turbines have been installed until June 15th, 2019.

            暖暖视频在线看片-暖暖视频免费高清日本-暖暖视频免费观看视频日本